Project

A local leisure facility had an gas boiler fail overnight resulting on a loss of heating for the leisure facility and the hotel residents were occupying.

​

B-engineering were asked to provide an emergency attendance to ensure the gas services were safe, the failed boiler would not cause any further risk and to assist the facility in implanting a temporary solution to provide heating.

Emergency Call Our Servicing
Emergency Call Out

Delivery

Utilising the inhouse gas specialists, the B-engineering group ensured that the gas devices service remained safe and safely isolated the failed boiler.

​

New connections to the existing LTHW system were welded in position to accommodate a temporary boiler and a new gas main supply provided to the boiler.

​

​Working from 8am through till past midnight to ensure the facility had suitable heating, all works were delivered by in house engineers.Working from 8am through till past midnight to ensure the facility had suitable heating, all works were delivered by in house engineers.

 

Benefits

Due to the fast response and the multi skilled team available, we were able to assist the facility in gaining a heating solution in a very short turned around time.

​

This fast response ensured the facility could remain open and avoid closing the facility – preventing huge losses.